Maass Flange Steel Building Project

REQUEST CONSULTATION

Success! Message received.

Maass Flange Corp.

SCOPE OF WORK:

Designed and engineered the steel building and erection only

 

CHALLENGES:

Working over large pits in the concrete and building was 68’ tall

 

DURATION OF JOB: 6 months

 

4 Pre-Engineered Steel Buildings

Size; 122’w X 300’L X 68’ T, with 60 ton crane in it.

80 X 225’ X 30’ with 40 ton crane.

30’ X 125’ X 30’ 2 story office building

25’ X 80’ X 12’ mechanical building.

REQUEST CONSULTATION