MUSTANG CATERPILLAR STEEL BUILDING PROJECT

REQUEST CONSULTATION

MUSTANG CAT

SCOPE OF WORK:

Furnish the design and fabrication of the Pre-Engineered Metal Building materials and erection only.

 

CHALLENGES:

All owner provided equipment penetrated the roof, dyno equipment, paint booths etc. which required additional support. Sliding door modification for passage of cranes moving outside of building on rail.

 

 

DURATION OF JOB: 11 months

 

 

SIZE OF BUILDING(s)

160’w X 360’ L X 45’ T, with 3 ea. 50-ton cranes and numerous jib cranes thru-out the building.

Office bld. 35’w X 180’L X 43’T with second floor mezzanine, elevator and two sets of stairs.