top of page

Majestic Steel Building Project

Success! Message received.

GET A FREE ESITMATE

Majestic Industries

SCOPE OF WORK:

Added an entry canopy on an existing prefab steel building along with the stone, and wood siding. Also added Cedar post and railing.

 

CHALLENGES:

Attaching the canopy to existing building.

 

DURATION OF JOB: 1 month

 

SIZE OF BUILDING:

12’ X 50’

GET A FREE ESITMATE

Success! Message received.

Anchor 1
bottom of page